This Fortune 250 DOD contractor in the aerospace and industrial engineering industry needed their manufacturing exterior site upgrades. The project scope includes: 2 new bio retention basins, controlled vestibule access for main DOD entry doors, new pad for pneumatic trash compactors, redefined truck exit route, new electronic security gate with security cameras and lighting for loading dock area access, ADA site upgrades (ramps, pedestrian path of travel and pass thru), bus shelter, new retention wall, new landscaping and new parking lot striping.