Bergman Construction oversaw the delivery and installation of 5 prefabricated repurposed shipping containers. These containers make up the new food and beverage venue, Big Bird’s Beach Bites, which is strategically located on the pool deck, adjacent to the existing wave pool. Project Scope included preparing the installation site for the containers, by demolishing current attractions and running utilities lines for plumbing, sewer, water and electrical. Once the containers were placed, utilities were hooked up, the containers received theming artwork, interior finishes installed, and kitchen equipment was installed.